TEL: 0086-21-64420682
FAX: 0086-21-51901292
EMAIL: info@greenycn.com
AT01
The accumulator be installed in the pipeline between the condenser and the inflating valve and have many function as drying, filtering and the system pressure protection with reasonable designs, compact structure and well corrosion resistance.